NGCP SUBSTATION UPGRADING PROJECT I_ II – TIWI

Owner’s Name: National Grid Corporation of the Philippines

Project Name:

DESIGN, INSTALLATION OF PRIMARY EQUIPMENT AND OTHER ELECTRICAL WORKS INCLUDING CONSTRUCTION OF THE EXPANSION/ UPGRADING OF TIWI PLANT A & C SWITCHYARDS UNDER TIWI SUBSTATION UPGRADING PROJECT – SCHEDULE I Sp18.TSUP.Lc-0333(I)

DESIGN, SUPPLY, DELIVERY, INSTALLATION,

TESTING AND COMMISSIONING OF SECONDARY DEVICES INCLUDING  OVERALL SUBSTATION  SYSTEM INTEGRATION, FUNCTIONAL TESTING, AND COMMISSIONING  WORKS COVERING THE EXPANSION/UPGRADING OF TIWI PLANT A & C SWITCHYARDS – SCHEDULE II Sp18.TSUP.Lc-0333(II)

Site Project:

BRGY. CALE, TIWI, ALBAY

Introduction:

The works to be performed under  this contract,  Schedule 1; design, installation  of primary equipment and  other  electrical  works  including construction  of the  expansion/ upgrading  of Tiwi  plant  A  & C switchyards under Tiwi substation, comprising switchyard  reinforcement works for the  existing 230kV substations in existence  of Aboitiz Geothermal power plant A & C. Under in this scope, Hansei will also rectify the transmission lines coming from Tiwi A-C line 1 and line 2, and also from NAGA- DARAGA Line. New 50MVA transformer will install to cater the 69kV Malinao –Ligao Line.

 

The works to be performed under this contract,  Schedule II; design, supply, delivery, installation, testing and  commissioning  of secondary  devices including overall  substation system  integration, functional testing,  and  commissioning works covering the  expansion/upgrading of tiwi plant  a & c switchyards, comprising switchyard  reinforcement works for the  existing 230kV substations in existence  of Aboitiz Geothermal power plant A & C. Under in this scope, in relation in schedule I, secondary protection from existing panel location to be transferred to Tiwi C new control building owned by NGCP.

See Image